2/17/2014

Cabinets!!

Ikea Lixtorp Cabinets.  From 150 boxes in the garage to cabinets on the wall.  The architect/designer/engineer/contractor has been very busy.

First Cabinet Goes Up

The first cabinet goes up!! Yippee.

The architect and the interior designer busy at work.

Vinyl Floor Planks

The first vinyl fooring plank goes down.  Note the careful placement!

I have stuff to post...

but I've been lazy and busy at the same time.  New job, new stuff going on.

Let's see.  I finished the soffitts.  Did a bunch of other stuff.  Then started on the kitchen.  My architect/designer/contractor has been very busy.

12/05/2011

Cutting soffitts.  I had these little insets in my sawhorses so I grabbed a couple of 2X2s and some leftover 2X4 pieces and a few 2 1/2in deck screws and I had a great soffitt panel cutter.  I've been cutting them with a medium coarse wood blade in my jigsaw.


The whole thing is 8ft long.  I love those little Irwin pistol grip clamps, and I used them to create a fence.  I'm about half way done with the whole house.  About on schedule for me, WAY BEHIND schedule for my wife!!

10/19/2011

Harris Healthcare

Larry is at Harris Healthcare Solutions now.  "Trusted at the intersection of life and data."

Pretty good so far.  I am working on a project for the Veteran's Administration.

Carol is still at the Merritt Island Library so we are half way stable :-)

5/09/2011

It's been busy...

Carroll and Brian and Beckett have returned home to Kansas and Carol and I are returning to normal.  Beckett, Brennan and Sydney can sure add a lot of energy to a house :-)

Grilling season is here.  Tim made steaks and veggies on the grill last night for Mother's Day.

Swimming season is here, the pool is open.